Becoming a bridge doctor
Pier Solutions was founded on the belief that short span bridge work could be done differently.
When contractors and construction crews collaborate with R.M. leaders, many factors come into play. Limited budgets, environmental impacts, structural constraints, roadway access for commuters — the considerations can seem endless.
When contractors and construction crews collaborate with R.M. leaders, many factors come into play. Limited budgets, environmental impacts, structural constraints, roadway access for commuters — the considerations can seem endless.
|
Bridge maintenance and repair jobs often require more strategic planning than demolition and reconstruction, but this additional work can pay incredible dividends in the form of lowered costs and shortened timelines. It’s these factors which can make all the difference for communities, especially those facing concerns like reduced infrastructure budgets or unexpected flood damage.
A common metaphor used for the model Pier follows when creating maintenance and repair plans is that of a bridge doctor. Healthcare workers must approach their work with a critical level of intention. Their decisions are crucial, lifesaving, and rely on a depth of knowledge to create tailor-made solutions on a case-by-case basis. No patient is exactly alike, and each treatment plan must look different. So, this poses the question that Pier engineers have been asking — and answering — for years now: What if we treated bridge maintenance like a medical diagnosis? |
Steps to diagnosing a bridge:
Phase one: Initial tests — AKA Preliminary Inspections
Similarly to a doctor examining a patient for the first time, engineers who’ve won a project do a preliminary survey of the site. Their initial inspections are tactile and thorough.
“We look at all the elements of the bridge to determine the deficiencies present,” explains Josef Reich, one of Pier’s longest serving resident bridge doctors.
Preliminary inspections vary depending on what material a bridge is made out of. Working with steel is different than timber, which is different from concrete.
First, engineers take photos of everything they notice, documenting observations as proof to refer back to during client discussions.
Next up is non-destructive testing. Picture this like checking the bridge’s reflexes with a tiny hammer, hearing its pulse with a stethoscope, peering into its eyes and ears with a flashlight for any anomalies or issues. In a real analysis, this testing includes a range of techniques. Engineers sound concrete or timber by striking it and listening for signs of separation or rot. They drill small holes into timber elements, and they take measurements of structural elements to compile a final report for the client.
Each of these observations helps engineers paint the full picture of a bridge’s condition, looking past the surface-level symptoms to uncover the root issues. From here, they have the information they need to begin to prescribe treatment —also known as a maintenance plan.
Similarly to a doctor examining a patient for the first time, engineers who’ve won a project do a preliminary survey of the site. Their initial inspections are tactile and thorough.
“We look at all the elements of the bridge to determine the deficiencies present,” explains Josef Reich, one of Pier’s longest serving resident bridge doctors.
Preliminary inspections vary depending on what material a bridge is made out of. Working with steel is different than timber, which is different from concrete.
First, engineers take photos of everything they notice, documenting observations as proof to refer back to during client discussions.
Next up is non-destructive testing. Picture this like checking the bridge’s reflexes with a tiny hammer, hearing its pulse with a stethoscope, peering into its eyes and ears with a flashlight for any anomalies or issues. In a real analysis, this testing includes a range of techniques. Engineers sound concrete or timber by striking it and listening for signs of separation or rot. They drill small holes into timber elements, and they take measurements of structural elements to compile a final report for the client.
Each of these observations helps engineers paint the full picture of a bridge’s condition, looking past the surface-level symptoms to uncover the root issues. From here, they have the information they need to begin to prescribe treatment —also known as a maintenance plan.
Phase two: The diagnosis — AKA Plan development
After compiling their findings and analyzing the test results, engineers categorize the issues they find under three levels of structural importance. The three tiers sort repairs based on severity, timing, and cost. Most municipal maintenance plans include numerous bridge sites, and so prioritization across locations also often accounts for transit routes and seasonal timing.
After compiling their findings and analyzing the test results, engineers categorize the issues they find under three levels of structural importance. The three tiers sort repairs based on severity, timing, and cost. Most municipal maintenance plans include numerous bridge sites, and so prioritization across locations also often accounts for transit routes and seasonal timing.
|
Primary repairs are broken structural elements. Load-bearing bridge components are responsible for supporting traffic, and they require immediate attention when they’re damaged. Think of these like a bridge’s vital signs. If a structure isn’t functioning safely and effectively, major work needs to be done before moving on to smaller details. Bridge decks, stringers, beams, pile caps, foundation walls. Is everything working properly from the ground up? A good bridge doctor stabilizes the patient first, then moves to future-oriented strategy.
|
|
Secondary repairs are non-critical. Damaged rails, crumbling embankment supports, slightly rotting pile caps. They’re warning signs, and they can wait until the make-or-break components are addressed. Repair timing is determined in line with local guidelines and priced out for clients accordingly. Think of it like rehabilitation, getting a patient back on their feet after the main procedure is completed.
|
|
Tertiary repairs look ahead. Preventative maintenance is a key component of any treatment plan and ensures that issues don’t reoccur anytime soon. Thinking ahead guarantees maximum ROI for clients and adds the extra step to ensure a structurally sound future for a bridge. Treatment rods are one example of this: they contain a fumigant which prevents rot and fungi from progressing.
This repair level also addresses issues like overgrown vegetation, and missing signage or secondary barriers. These pieces are non-essential, but they’re highly important when preserving the lifespan and usefulness of a structure. |
Phase three: The treatment — AKA Construction
After a draft plan is presented to the municipal council, there’s room for dialogue. Priorities might need slight adjustment, budgets can flex and change, and the entire community road network is considered as a whole. It’s important to analyze community needs and structure functionality. Just because a bridge has occupied a space previously, doesn’t mean it needs to stay.
“We might reduce a bridge to a culvert, if there’s not a lot of flow there,” Josef said.
After a draft plan is presented to the municipal council, there’s room for dialogue. Priorities might need slight adjustment, budgets can flex and change, and the entire community road network is considered as a whole. It’s important to analyze community needs and structure functionality. Just because a bridge has occupied a space previously, doesn’t mean it needs to stay.
“We might reduce a bridge to a culvert, if there’s not a lot of flow there,” Josef said.
|
This stage is also where hydrological studies come in. Engineers use this secondary analysis to predict what the next five years or so will look like for each structure. What traffic will need to cross the bridge in that time? What wildlife will need to swim under it? How long can the structure continue functioning in its current state? What repairs or preventative maintenance can extend a faltering lifespan?
As the maintenance projects develop over the course of multiple years, engineers will revise and refer back to the original plan. Bridge repairs are dynamic. and they require continual observation and adaptation to maintain efficiency and cost-effectiveness. This process also requires open communication between labourers, engineers, and municipal leaders. A jobsite, like a hospital room, holds risk and unpredictability. Natural disasters like flooding, sudden snowfall, or intense cold can affect timelines, and sudden advantages like a string of great weather can move projects ahead of schedule. |
From first inspection to final execution, bridge repair is a highly relational process. By conducting a thorough examination of each site, developing a comprehensive and dynamic maintenance plan, and communicating continually throughout repairs, there’s no doubt Pier’s engineers have earned their titles as bridge doctors.
To learn more about Pier’s recent projects and what makes our process different from competitors, connect with us on LinkedIn.